Skip to content

Examples / EX—01

Incident review

INC-2231, berth sync outage. A deploy shrank a connection pool from 40 to 8 and schedules stopped loading for ten minutes. The timeline, the charts and the logs share one moment and one window: drag the playhead, pick an event or open a log line and the others follow; zoom any of them and the rest keep pace. Invented service, invented people.

Impact

10 min

Declared to all clear

Peak error rate

23.4%

Per minute, from the logs

Failed requests

70

Deploy to all clear

Lines in view

1,233

Follows the zoom

Incident timeline

Arrow keys pan, plus and minus zoom, 0 fits every event, Home and End jump to the edges. Pinch or Control-scroll to zoom.

Left and right move through a lane, up and down change lanes, Enter selects, Escape clears.

Kofi suspects the pool

09:31 · Response

Connection resets from tide-db began seconds after the deploy finished.
Error rate

Left and right arrows read each value; Shift extends a measured period and Enter zooms to it. Plus and minus zoom, 0 shows the whole range, Escape clears.

p95 latency

Left and right arrows read each value; Shift extends a measured period and Enter zooms to it. Plus and minus zoom, 0 shows the whole range, Escape clears.